Pertamina Hulu Energi Projects 25.5 Million Barrels Oil and Gas Production for Nov-Dec 2025
Back
Back
5
Impact
4
Urgency
Sentiment Analysis
BearishPositiveBullish
PublishedDec 5
Sources1 verified

Pertamina Hulu Energi Projects 25.5 Million Barrels Oil and Gas Production for Nov-Dec 2025

AnalisaHub Editorial·December 5, 2025
Executive Summary
01

Executive Summary

Key insights and market outlook

Pertamina Hulu Energi (PHE), a subsidiary of Pertamina, projects 25.5 million barrels of oil and gas production for November-December 2025. This projection aims to meet domestic demand during the year-end period. As of October 2025, PHE recorded 556,000 barrels per day of oil production and 2.762 million cubic feet per day of gas production. The company is preparing infrastructure, including 113 cargo shipments and 104 pipeline distributions, to ensure smooth delivery.

Full Analysis
02

Deep Dive Analysis

Pertamina Hulu Energi Boosts Oil and Gas Production for Year-End Demand

Strategic Production Projection

Pertamina Hulu Energi (PHE), the upstream subholding of Pertamina, is projecting to achieve 25.5 million barrels of oil and gas production combined during November and December 2025. This strategic projection is designed to meet the increased domestic demand during the year-end period, particularly during the holiday season.

Current Production Performance

As of October 2025, PHE has recorded an average daily oil production of 556,000 barrels and gas production of 2.762 million cubic feet per day. These production figures demonstrate the company's significant contribution to Indonesia's energy supply. The projected increase for November-December is part of PHE's effort to maintain energy security during the peak demand period.

Infrastructure Readiness

To ensure the smooth distribution of the projected oil and gas production, PHE is preparing its infrastructure comprehensively. The company plans to distribute the energy through 113 cargo shipments and 104 distributions via pipelines and trucking. These will be delivered to various receiving facilities across the country, supporting both industrial and domestic needs.

Health, Safety, and Environmental Focus

PHE maintains its commitment to Health, Safety, Security, and Environment (HSSE) standards by strengthening risk mitigation measures and maintaining standby personnel across all operational areas. This approach is crucial in ensuring the reliability of operations while safeguarding workers, contractors, and the surrounding environment.

Coordination with Stakeholders

The company is conducting intensive coordination with various stakeholders, including SKK Migas, the Ministry of Energy and Mineral Resources, refineries, consumers, and other relevant parties. This collaboration is essential to guarantee that energy supplies remain stable during the high-demand period.

Commitment to Energy Resilience

PHE's readiness for the year-end demand reflects its commitment to maintaining national energy resilience. By optimizing production facilities, strengthening distribution networks, and enhancing monitoring systems, PHE aims to fulfill energy needs effectively during this critical period.

Original Sources
03

Source References

Click any source to view the original article in a new tab

Story Info

Published
1 month ago
Read Time
12 min
Sources
1 verified

Topics Covered

Energy ProductionOil and GasInfrastructure Development

Key Events

1

Oil and Gas Production Projection

2

Energy Infrastructure Preparation

Timeline from 1 verified sources